close window

Fei Junlong

 Total EVAs:  4
 Total EVA time:  ~29h ~56m

No. Date Together with Time Main tasks and notes
 1  09.02.2023  Zhang Lu  7h 06m
Installing the first additional pump block of the thermal control system and attaching the first external platform to the Mengtian module of Tiangong Station
 2  28.02.2023  Zhang Lu  7h 50m
They installed an instrument with 20 plugs during their 2nd and most secret spacewalk.
 3  30.03.2023  Zhang Lu  ~7h 30m
In the 3rd spacewalk, they connected inter-module cables.
 4  15.04.2023  Zhang Lu  ~7h 30m
Installing the second additional pump block of the thermal control system and attaching the second external platform to the Mengtian module of Tiangong Station