close window |
Total EVAs: | 4 | ||
Total EVA time: | ~29h ~56m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 09.02.2023 | Zhang Lu | 7h 06m |
Installing the first additional pump block of
the thermal control system and attaching the first external platform to the
Mengtian module of Tiangong Station |
2 | 28.02.2023 | Zhang Lu | 7h 50m |
They installed an instrument with 20 plugs
during their 2nd and most secret spacewalk. |
3 | 30.03.2023 | Zhang Lu | ~7h 30m |
In the 3rd spacewalk, they connected
inter-module cables. |
4 | 15.04.2023 | Zhang Lu | ~7h 30m |
Installing the second additional pump block of
the thermal control system and attaching the second external platform to the
Mengtian module of Tiangong Station |