close window |
Total EVAs: | 6 | ||
Total EVA time: | 39h 54m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 13.01.2017 | S. Kimbrough | 5h 58m |
The astronauts installed adapter plates and
hooked up electrical connections for the final three of six new lithium-ion
batteries . |
2 | 24.03.2017 | S. Kimbrough | 6h 34m | |
3 | 16.06.2021 | S. Kimbrough | 7h 15m |
They installed the first array on the far end of
the left (port) side of the station's backbone truss structure (P6) to upgrade
the 2B power channel. |
4 | 20.06.2021 | S. Kimbrough | 6h 28m |
The duo worked on the far end of the P6 to
unroll the first of two iROSAs that will augment power capability for the port
6 truss' 2B power channel. |
5 | 25.06.2021 | S. Kimbrough | 6h 45m |
The spacewalkers installed the second solar
array to upgrade the 4B power channel on the P6 truss. |
6 | 12.09.2021 | A. Hoshide | 6h 54m |
They installed a support bracket on the inward
port side of the station's backbone truss structure in a position known as P4.
The crew also replaced a device that measures the electrical charging potential
of the arrays. |