close window |
Total EVAs: | 6 | ||
Total EVA time: | 33h 09m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 09.07.2013 | C. Cassidy | 6h 07m |
The astronauts replaced a space-to-ground
communications receiver and wireless video equipment and installed power and
cables for a Russian multipurpose laboratory module. |
2 | 16.07.2013 | C. Cassidy | 1h 32m |
The spacewalk was terminated after just one hour
due to an unexplained build up of water inside the space suit helmet of Luca
Parmitano. |
3 | 15.11.2019 | A. Morgan | 6h 39m | |
4 | 22.11.2019 | A. Morgan | 6h 33m |
They continued their work to replace a cooling
system and fixed a coolant leak on
AMS-02. Luca Parmitano and Andrew Morgan cut and label
stainless steel tubes, of which there are eight. |
5 | 02.12.2019 | A. Morgan | 6h 02m |
Main task was to install a new pump module. The
astronauts installed a bypass to the old thermal control system by attaching a
new one off the side of
AMS-02. |
6 | 25.01.2020 | A. Morgan | 6h 16m |
The main task was to carry out leak checks, make
adjustments and then to re-installed insulation on
AMS-02. |