close window |
EVAs: | 1 | ||
Total EVA time: | 5h 57m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 16.02.2018 | M. Vande Hei | 5h 57m |
The astronauts moved a Latching End Effector
(LEE), or hand, for the Canadian-built robotic arm, Canadarm2, from a payload
attachment on the station's Mobile Base System rail car to the Quest airlock.
|