close window

Akihiko Hoshide

 Total EVAs:  4
 Total EVA time:  28h 17m

No. Date Together with Time Main tasks and notes
 1  30.08.2012  S. Williams  8h 17m
The astronauts replaced a faulty power routing unit (partly failed) on the station's truss and run cables for an upcoming Russian laboratory module.
 2  05.09.2012  S. Williams  6h 28m
The astronauts completed the installation of a spare power unit on the station's truss.
 3  01.11.2012  S. Williams  6h 38m
The astronauts repaired an ammonia leak on one of the station's port-side radiators.
 4  12.09.2021  T. Pesquet  6h 54m
They installed a support bracket on the inward port side of the station's backbone truss structure in a position known as P4. The crew also replaced a device that measures the electrical charging potential of the arrays.