close window |
Total EVAs: | 5 | ||
Total EVA time: | 31h 55m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 22.05.2000 | J. Voss | 6h 44m |
Finishing crane mounting, repairing works
|
2 | 01.06.2006 | P. Vinogradov | 6h 31m |
Installing a new hydrogen vent valve on the hull
of the Zvezda Service Module to bypass a similar valve that is
clogged. |
3 | 03.08.2006 | T. Reiter | 5h 54m |
Installing items of hardware in preparation for
future
ISS assembly work and set up for deployment a number
of instruments and experiments mounted on the outside of the station |
4 | 19.08.2016 | K. Rubins | 5h 58m | |
5 | 01.09.2016 | K. Rubins | 6h 48m |
They retracted a thermal radiator. They also
tightened struts on a solar array joint, and installed the first of several
enhanced high-definition television cameras. |