Peggy Annette Whitson

 Total EVAs:  10
 Total EVA time:  60h 21m

No. Date Together with Time Main tasks and notes
 1  16.08.2002  V. Korzun  4h 25m
Installing first six of an eventuel 23 debris shields on Zvezda
 2  09.11.2007  Y. Malenchenko  6h 55m
They disconnected cables from Destiny to PMA 2, demated avionics cables and released fluid tray bolts. They performed also a temporary stow of CETA light on Destiny.
 3  20.11.2007  D. Tani  7h 16m
Complete the exterior hookup of Harmony. Much of the spacewalk included the moving of a 300-pound, 18.5-foot fluid tray from its temporary location at the center of the station's main truss to Harmony.
 4  24.11.2007  D. Tani  7h 04m
Complete the exterior hookup of Harmony. Much of the spacewalk included the moving of another 300-pound, 18.5-foot fluid tray from its temporary location at the center of the station's main truss to Harmony.
 5  18.12.2007  D. Tani  6h 56m
Examination of the starboard Solar Alpha Rotary Joint (SARJ) and return a trundle assembly to the station's interior.
 6  30.01.2008  D. Tani  7h 10m
Replacing a motor with electrical failures, the Bearing Motor Roll Ring Module (BMRRM), called the 'broom". Inspection of the starboard Solar Alpha Rotary Joint (SARJ).
 7  06.01.2017  S. Kimbrough  6h 32m
The astronauts installed adapter plates and hooked up electrical connections for three of six new lithium-ion batteries.
 8  30.03.2017  S. Kimbrough  7h 04m
This spacewalk featured the astronauts reconnecting cables and electrical connections on PMA-3 at its new home on top Harmony.
 9  12.05.2017  J. Fischer  4h 13m
They replaced an avionics box on the starboard truss called an ExPRESS Logistics Carrier (ELC), a storage platform.
 10  23.05.2017  J. Fischer  2h 46m
The astronauts replaced a backup multiplexer-demultiplexer (MDM) that failed on May 20, 2017.