Total EVAs: | 10 | ||
Total EVA time: | 60h 21m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 16.08.2002 | V. Korzun | 4h 25m |
Installing first six of an eventuel 23 debris
shields on Zvezda |
2 | 09.11.2007 | Y. Malenchenko | 6h 55m | |
3 | 20.11.2007 | D. Tani | 7h 16m |
Complete the exterior hookup of Harmony. Much of
the spacewalk included the moving of a 300-pound, 18.5-foot fluid tray from its
temporary location at the center of the station's main truss to
Harmony. |
4 | 24.11.2007 | D. Tani | 7h 04m |
Complete the exterior hookup of Harmony. Much of
the spacewalk included the moving of another 300-pound, 18.5-foot fluid tray
from its temporary location at the center of the station's main truss to
Harmony. |
5 | 18.12.2007 | D. Tani | 6h 56m |
Examination of the starboard Solar Alpha Rotary
Joint (SARJ) and return a trundle assembly to the station's
interior. |
6 | 30.01.2008 | D. Tani | 7h 10m |
Replacing a motor with electrical failures, the
Bearing Motor Roll Ring Module (BMRRM), called the 'broom". Inspection of the
starboard Solar Alpha Rotary Joint (SARJ). |
7 | 06.01.2017 | S. Kimbrough | 6h 32m |
The astronauts installed adapter plates and
hooked up electrical connections for three of six new lithium-ion batteries.
|
8 | 30.03.2017 | S. Kimbrough | 7h 04m |
This spacewalk featured the astronauts
reconnecting cables and electrical connections on
PMA-3 at its new home on top Harmony. |
9 | 12.05.2017 | J. Fischer | 4h 13m |
They replaced an avionics box on the starboard
truss called an ExPRESS Logistics Carrier (ELC), a storage platform. |
10 | 23.05.2017 | J. Fischer | 2h 46m |
The astronauts replaced a backup
multiplexer-demultiplexer (MDM) that failed on May 20, 2017. |