close window

James Dougal Adrianus "Ox" van Hoften

 Total EVAs:  4
 Total EVA time:  21h 08m

No. Date Together with Time Main tasks and notes
 1  08.04.1984  G. Nelson  2h 38m
Attemp to recover SMM with MMU (Nelson)
 2  11.04.1984  G. Nelson  6h 44m
Repairing of SMM, test of MMU (van Hoften)
 3  31.08.1985  W. Fisher  7h 20m
Recovery of satellite Syncom IV-3, beginning of repairing work
 4  01.09.1985  W. Fisher  4h 26m
Finishing repairing work and deploying satellite