Total EVAs: | 5 | ||
Total EVA time: | 33h 42m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 12.09.2006 | J. Tanner | 6h 26m |
Installation of power and data cables between
the P1 and P3/P4 structures in preparation for solar array
deployment |
2 | 15.09.2006 | J. Tanner | 6h 42m |
Performing final tasks required for activation
of the Solar Alpha Rotary Joint (SARJ); they also prepared the P3/P4 truss and its
solar arrays for operation by setting the stage for deployment of the truss'
radiator |
3 | 18.11.2008 | S. Bowen | 6h 52m |
Replacing a depleted nitrogen tank and a device
used to help the flow of coolant from the truss. They also started inspecting,
cleaning and lubricating the starboard
SARJ and begin replacing 11 of 12 trundle bearings.
|
4 | 20.11.2008 | R. Kimbrough | 6h 45m |
Relocating two equipment carts, setting the
stage for the installation of the starboard S6 truss. They also lubricated the
end effector of the Canadarm2. They also continued lubricating the starboard
SARJ and replacing trundle bearings. |
5 | 22.11.2008 | S. Bowen | 6h 57m |
Completing starboard
SARJ cleaning, lubricating and trundle bearing
work. |