close window |
Total EVAs: | 3 | ||
Total EVA time: | 20h 05m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 30.07.2005 | S. Noguchi | 6h 50m |
Testing thermal protection system repair
techniques and installation of the External Stowage Platform-2 Attachment
Device (ESPAD) on the space station |
2 | 01.08.2005 | S. Noguchi | 7h 14m |
Replace of a failed International Space Station
attitude control gyroscope |
3 | 03.08.2005 | S. Noguchi | 6h 01m |
Attach of a massive external tool box to the
space station's Quest airlock module; mounting an experiment package on the top
of the station's solar array truss; and remove two "gap fillers" sticking up
between heat shield tiles on Discovery's belly |