close window

John Daniel "Danny" Olivas

 Total EVAs:  5
 Total EVA time:  34h 28m

No. Date Together with Time Main tasks and notes
 1  11.06.2007  J. Reilly  6h 15m
Hooking up power cables to begin activation of the S3/S4 truss and starting to prepare the Solar Alpha Rotary Joint, also known as the SARJ, for activation
 2  15.06.2007  J. Reilly  7h 58m
Finishing removing the SARJ's launch locks and restraints so that it can be activated and repairing of the Shuttle's heat shield
 3  01.09.2009  N. Stott  6h 35m
Preparing for the replacement of an empty ammonia tank on the station's port truss. They also retrieved a materials processing experiment and a European science experiment mounted outside the Columbus laboratory.
 4  03.09.2009  C. Fuglesang  6h 39m
Removing the new ammonia tank from the shuttle's payload bay and replacing it with the used tank on the station.
 5  05.09.2009  C. Fuglesang  7h 01m
Preparing for the arrival of the Tranquility node by attaching cables between the starboard truss and the Unity node. The spacewalkers also replaced a communications sensor device, installed two new GPS antennas and a new circuit breaker.