close window |
Total EVAs: | 3 | ||
Total EVA time: | 19h 20m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 04.12.2000 | J. Tanner | 7h 33m |
Mounting P 6 solar array structure |
2 | 05.12.2000 | J. Tanner | 6h 37m |
Mounting P 6 solar array structure |
3 | 07.12.2000 | J. Tanner | 5h 10m |
Mounting P 6 solar array structure |