close window |
Total EVAs: | 4 | ||
Total EVA time: | 24h 21m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 15.10.2000 | L. Chiao | 6h 28m |
The S-band Antenna Support Assembly was
relocated on the Z1 Truss. The port Extravehicular Tool Storage Devices were
released and transferred from the Spacelab Logistics Pallet to the Z1 Truss.
The Space-to-Ground Antenna dish was installed onto the boom and the boom was
deployed. |
2 | 17.10.2000 | L. Chiao | 6h 48m |
Two DC-to-DC Converter Unit-Heat Pipes were
installed on Z1. The Z1 keel pin assembly was then relocated to another
location on Z1. The starboard Extravehicular Tool Storage Device was released
and transferred from the Spacelab Logistics Pallet to the Z1 Truss. |
3 | 07.11.2005 | V. Tokarev | 5h 22m |
Installing a camera on the port side of the
station's horizontal truss structure and removing an old experiment from the
solar array truss on top of the facility |
4 | 03.02.2006 | V. Tokarev | 5h 43m |
Installing a safing bolt to prevent the
inadvertent firing of an electro mechanical cable cutter on a mobile
transporter used to move the station's big robot arm to different work sites;
deployed SuitSat, an old Russian spacesuit with an amateur radio
transmitter |