close window |
Total EVAs: | 2 | ||
Total EVA time: | 15h 23m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 11.02.2008 | R. Walheim | 7h 58m |
Preparing the Columbus module for installation
on Harmony. They installed the Power Data Grapple Fixture on Columbus.
Preparing work to remove the Nitrogen Tank Assembly, a part of the
stations thermal control system, from the P1 truss. |
2 | 15.02.2008 | R. Walheim | 7h 25m |
Installing two payloads on Columbus' exterior:
SOLAR. Moving a failed control moment gyroscope from its storage location on
the station to the shuttle's payload bay for return to Earth. |