close window

Stanley Glen Love

 Total EVAs:  2
 Total EVA time:  15h 23m

No. Date Together with Time Main tasks and notes
 1  11.02.2008  R. Walheim  7h 58m
Preparing the Columbus module for installation on Harmony. They installed the Power Data Grapple Fixture on Columbus. Preparing work to remove the Nitrogen Tank Assembly, a part of the station’s thermal control system, from the P1 truss.
 2  15.02.2008  R. Walheim  7h 25m
Installing two payloads on Columbus' exterior: SOLAR. Moving a failed control moment gyroscope from its storage location on the station to the shuttle's payload bay for return to Earth.