close window |
Total EVAs: | 9 | ||
Total EVA time: | 59h 28m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 20.11.2008 | H. Stefanyshyn-Piper | 6h 45m |
Relocating two equipment carts, setting the
stage for the installation of the starboard S6 truss. They also lubricated the
end effector of the Canadarm2. They also continued lubricating the starboard
SARJ and replacing trundle bearings. |
2 | 24.11.2008 | S. Bowen | 6h 07m | |
3 | 06.01.2017 | P. Whitson | 6h 32m |
The astronauts installed adapter plates and
hooked up electrical connections for three of six new lithium-ion batteries.
|
4 | 13.01.2017 | T. Pesquet | 5h 58m |
The astronauts installed adapter plates and
hooked up electrical connections for the final three of six new lithium-ion
batteries . |
5 | 24.03.2017 | T. Pesquet | 6h 34m |
Main objective was to prepare the
PMA-3 for installation of the second
IDA. They disconnected cables and electrical
connections on
PMA-3 to prepare for its robotic move. The
spacewalkers also installed on the starboard zero truss (ITS) a new computer relay box equipped with advanced
software for the adapter. They lubricated the latching end effector on the Canadarm2 robotic arm, inspected a radiator valve suspected of a small ammonia leak and replaced cameras on the Japanese segment of the outpost. |
6 | 30.03.2017 | P. Whitson | 7h 04m |
This spacewalk featured the astronauts
reconnecting cables and electrical connections on
PMA-3 at its new home on top Harmony. They also
installed the second of the two upgraded computer relay boxes on the station's
truss and installed shields and covers on
PMA-3 and the now-vacant common berthing mechanism
port on Tranquility. |
7 | 16.06.2021 | T. Pesquet | 7h 15m |
They installed the first array on the far end of
the left (port) side of the station's backbone truss structure (P6) to upgrade
the 2B power channel. |
8 | 20.06.2021 | T. Pesquet | 6h 28m |
The duo worked on the far end of the left (port)
side of the station's backbone truss structure (P6) to deploy, or unroll, the
first of two ISS Roll Out Solar Arrays (iROSAs) that will augment power
capability for the port 6 truss' 2B power channel. Before the new array can be
deployed and begin providing power to the orbiting laboratory, the two needed
to install the electrical cables and drive the final two bolts to enable the
solar array to unroll it into its fully laid-out position. |
9 | 25.06.2021 | T. Pesquet | 6h 45m |
The spacewalkers installed the second solar
array to upgrade the 4B power channel on the P6 truss. |