close window

Michael Scott Hopkins

 Total EVAs:  5
 Total EVA time:  32h 01m

No. Date Together with Time Main tasks and notes
 1  21.12.2013  R. Mastracchio  5h 28m
The EVA mainly focused on disconnecting the failed loop A pump module from its location on the Starboard 1 (S1) Truss - including the infamously difficult ammonia disconnections.
 2  25.12.2013  R. Mastracchio  7h 30m
They removed a spare pump module from the ESP-3 and installed it on the Starboard 1 (S1) Truss.
 3  27.01.2021  V. Glover  6h 56m
This spacewalk focused on completing cable and antenna rigging for the "Bartolomeo" science payloads platform outside the ESA Columbus module. The duo also configured a Ka-band terminal, known as COL-Ka.
 4  01.02.2021  V. Glover  5h 20m
Main tasks were the installation of a final lithium-ion battery adapter plate on the port 4 (P4) truss that wrapped up battery replacement work begun in January 2017.
 5  13.03.2021  V. Glover  6h 47m
They vent and relocated ammonia jumper cables, installed a structural "stiffener" on the airlock thermal cover, and completed the connection of payload cables on the new Bartolomeo platform on the Columbus module.