close window

Michael Edward Fossum

 Total EVAs:  7
 Total EVA time:  48h 32m

No. Date Together with Time Main tasks and notes
 1  08.07.2006  P. Sellers  7h 31m
Maintenance on the station’s mobile transporter and a test of astronaut movement on the end of the robotic arm boom extension for possible heat shield repairs during future flights
 2  10.07.2006  P. Sellers  6h 47m
Installation of a spare thermal control system pump on to the outside of the Quest Airlock; replacement of reel assembly for a cable that provides power and data to the station’s mobile transporter
 3  12.07.2006  P. Sellers  7h 11m
Demonstration of on-orbit heat shield repair techniques
 4  03.06.2008  R. Garan  6h 48m
Transfer of the Orbiter Boom Sensor System back to the shuttle from its temporary location of the station's truss, or backbone. The crew then prepared the JEM PM for its removal from the shuttle's payload bay.
 5  05.06.2008  R. Garan  7h 11m
Installing covers and external television equipment on the JEM PM and remove covers on the JEM RMS. They also prepared for the relocation of the Japanese logistics module.
 6  08.06.2008  R. Garan  6h 33m
Replacing a failed nitrogen tank assembly on the station's truss with a spare that was temporarily stored on one of the station external stowage platforms. They also retrieved a failed camera system on the truss.
 7  12.07.2011  R. Garan  6h 31m
Transfer of a failed ammonia pump to the shuttle cargo bay, transfer of the Robotic Refueling Mission (RRM) to the station and place an experiment on ELC-2 for long duration exposure.